생산공정도

PRODUCTION PROCESS

생산공정도

제작 공정도

ANCHOR BOLT STUD BOLT HEADED BOLT NUT

제조 설비

MAIN FACILITIES
EQUIPMENT CAPACITY Q’ TY EQUIPMENT CAPACITY Q’ TY
Band Saw
CNC Band Saw
400a/350/330/300a 4 Marking
Machine
Ø10 ~ Ø100 4
CIRCULAR Saw P-150B/P-65B/CK3-125 3 Press 200Ton/50Ton 2
Chamfering M/C Ø10 ~ Ø100 5 Lathe Ø 19 ~ Ø 32 7
Thread Rolling M/C 100/60/50/40/30/20 Tons 7 CNC Lathe Lynx 200 27
Hydraulic Bending M/C 50/150 Tons 2 Bench Lathe - 4
Friction Press 150 Tons 1 Pit Furnace 200~1,100 ℃ 5
Sand Blast M/C - 2 Milling M/C - 5
OTHER FACILITIES
EQUIPMENT CAPACITY Q’ TY EQUIPMENT CAPACITY Q’ TY
Up-Right Drilling M/C W400, 2200h 2 Hoist 25m, 2.8ton
10m, 2.8ton
6
M/R Hoist 2.8 Tons 6 Air Balancer 350kg 3
Air Compressor 20kw(15hp) 5 Arc Welder - 4
Automatic
Assembling M/C
- 8 Buffing M/C C110 X 3000L
60 X 1000L
2